← All projects
Decide whether a Goa pharma plant should add a third shift, with a cost and staffing model
A pharma plant in a Goa estate has more orders than two shifts can make, and must choose between a third shift, overtime or outsourcing, each with different costs, staffing and quality risks.
The full project is for Full Access holders
Unlock what to hand in and a step-by-step AI build guide: how to think about it, which AI tool fits each step, prompts to copy, and how to check the AI's work. Plus every other project in the catalogue.
- 🔒 What you hand in
- 🔒 Step 1: Think first
- 🔒 Step 2: Gather
- 🔒 Step 3: Build with AI
- 🔒 Step 4: Check the AI's work
- 🔒 Step 5: Finish and show
More advanced projects in Manufacturing
MANUFACTURINGADVANCED
Estimate overall equipment effectiveness for a packing line and plan improvements
~6 hrs🔒 Details
MANUFACTURINGADVANCED
Design a kanban card system for the raw material stores of a small unit
~6 hrs🔒 Details
MANUFACTURINGADVANCED
Build a launch readiness checklist and risk register for a new product on an existing line
~5.5 hrs🔒 Details