APAI Praveen
PROJECTS · LEARN BY DOING

Projects to do

1,500 simple, solvable projects across 20 industries and 10 business functions, at three levels. No coding. Pick one, finish it, and put it in your portfolio.

See what learners have built →

Clear
EverythingBanking & fintech 50Retail & e-commerce 50FMCG & consumer brands 50Hospitality & tourism 50Healthcare & pharma 50Real estate & construction 50Manufacturing 50Logistics & supply chain 50Education & edtech 50IT & SaaS 50Media & entertainment 50Agriculture & food 50Energy & sustainability 50Startups & entrepreneurship 50Consulting & professional services 50HR & people 50NGOs & public policy 50Sports & events 50Automobile & mobility 50Telecom 50
By functionFinance & accounting 50Marketing 50Operations & supply chain 50Strategy & consulting 50HR, OB & leadership 50Economics & public policy 50IS & digital business 50Decision sciences & analytics 50Entrepreneurship & innovation 50Communication & liberal studies 50
Any levelStarterBuilderAdvancedFree samples
Titles and the problem are open to everyone. The deliverable, starter hints and AI prompts unlock with Full Access — or try the free samples first.
50 projects match
MANUFACTURINGBUILDER
Compare small and large batches for a unit that makes three flavours of snack

Switching a line between flavours takes cleaning time, so small batches lose output while large batches build up stock nobody has ordered.

~3.5 hrs🔒 Details
MANUFACTURINGBUILDER
Find the bottleneck on a snack pouch packing line from public videos

Snack packing lines have filling, sealing, coding and boxing stations, and the slowest one limits what leaves the gate each hour.

~3.5 hrs🔒 Details
MANUFACTURINGBUILDER
Turn a carpentry workshop's offcuts and sawdust into saleable ideas

A small furniture workshop throws away offcuts and sawdust every week, though some of it could become products or income.

~2.5 hrs🔒 Details
MANUFACTURINGBUILDER
Plan a waste walk through a neighbourhood tailoring unit

Tailoring units lose time to walking, waiting, re-stitching and spare stock, yet owners are usually too busy to notice.

~3 hrs🔒 Details
MANUFACTURINGBUILDER
Compare how three Indian brands talk about where their products are made

Brands use words like made in India and handcrafted loosely, and buyers cannot tell which claims they can check.

~2.5 hrs🔒 Details
MANUFACTURINGBUILDER
Design a shift handover sheet for a small plastic moulding unit

When one shift leaves, important facts about machine settings, faults and stock are lost, and the next shift repeats old mistakes.

~2.5 hrs🔒 Details
MANUFACTURINGBUILDER
Review the ergonomics of a sewing or assembly workstation

Workers who sit or stand in awkward positions all day develop pain and make more mistakes, and a small change in layout can help.

~2.5 hrs🔒 Details
MANUFACTURINGBUILDER
Draft a preventive maintenance calendar for a neighbourhood flour mill

A small flour mill repairs machines only after they stop, which costs a day of sales every time a belt or bearing gives way.

~3 hrs🔒 Details
MANUFACTURINGBUILDER
Trace a product's public complaints back to causes in the factory

Customer complaints about a product usually have roots in making, materials or packing, but companies read them only as service issues.

~3 hrs🔒 Details
MANUFACTURINGBUILDER
Build a cost and price sheet for a small bakery's cookie range

A small bakery sells several cookie types but does not know which ones earn money once ingredients, gas, labour and packing are counted.

~3 hrs🔒 Details
MANUFACTURINGADVANCED
Estimate overall equipment effectiveness for a packing line and plan improvements

A packing line may be running but still lose output through stops, slow running and rejects, which one measure called OEE brings together.

~6 hrs🔒 Details
MANUFACTURINGADVANCED
Design a kanban card system for the raw material stores of a small unit

A small unit either runs out of an item in the middle of a job or orders too much, because nobody has a signal for when to reorder.

~6 hrs🔒 Details
MANUFACTURINGADVANCED
Build a launch readiness checklist and risk register for a new product on an existing line

Adding a new product to a running line can cause errors, stoppages and rejects if materials, training and checks are not ready on day one.

~5.5 hrs🔒 Details
MANUFACTURINGADVANCED
Model the true cost of a local versus an imported raw material

An imported material may look cheaper per kilo, but freight, duty, waiting time, stock and quality problems can turn the comparison around.

~5.5 hrs🔒 Details
MANUFACTURINGADVANCED
Scale up a handicraft cluster by mixing hand and machine steps

A cluster of toy or textile artisans gets orders larger than it can fill by hand, yet fears that machines would erase what makes its work special.

~6.5 hrs🔒 Details
MANUFACTURINGADVANCED
Plan shifts and staffing for a sweets maker's festival rush

A sweets maker's orders jump sharply before a festival, and without a plan the unit either runs short of hands or pays idle staff afterwards.

~5.5 hrs🔒 Details
MANUFACTURINGADVANCED
Write a playbook for a unit facing a sudden shortage of its key raw material

When a key raw material disappears for weeks, small units panic-buy, stop production or change recipes without thinking through the effects.

~5.5 hrs🔒 Details
MANUFACTURINGADVANCED
Plan how a family-run unit can move its paper registers into spreadsheets

A family-run unit keeps stock, orders and wages in paper registers, so it cannot see what is selling, what is running out or who is owed money.

~6 hrs🔒 Details
MANUFACTURINGADVANCED
Estimate the cost of making an electric kettle from its parts

A kettle sells for much more than its materials, and few buyers know what separates the two numbers.

~6 hrs🔒 Details
MANUFACTURINGADVANCED
Model reorder points and safety stock for five raw materials in a small unit

A small unit reorders by feel, which leads to stock-outs for some materials and cash tied up in others.

~5.5 hrs🔒 Details
MANUFACTURINGADVANCED
Plan a low-waste, low-water shop floor for a small packaged-food unit

A food unit throws away peels, rejects and wash water every day, and each of these is both a cost and a burden on the environment.

~6.5 hrs🔒 Details
MANUFACTURINGADVANCED
Write a quality manual for a small unit supplying parts to a carmaker like Tata Motors

A small parts unit that wants to supply a large carmaker must show it can make the same part the same way every time, and many small units cannot.

~7 hrs🔒 Details
MANUFACTURINGADVANCED
Read a carmaker's annual report for what it says about plants, suppliers and safety

Annual reports describe how a manufacturer thinks about plants, suppliers and safety, but few students know how to read them for that.

~6 hrs🔒 Details
MANUFACTURINGADVANCED
Build a kaizen improvement pack for a three-station assembly line

Workers on a small assembly line see many small problems but have no simple way to suggest and test fixes.

~5.5 hrs🔒 Details